The Asbestos Group were contracted by the client’s insurers to carry out a major soft strip of these fire damaged premises which had also suffered contamination throughout due to the ACM’s found within the internal infrastructure of the building. A full contents inventory was carried out in addition to the soft strip and an external litter pick was completed at the end of the project.
Photos show examples of the fire damaged second bedroom of the property before and after the completion of works.
The second set of photos shows the debris from the damaged facias which had fallen to the side and the property and after the completion of works
Most Recent News
- Asbestos Group Appoint General Manager 20 November 2024
- Asbestos Commercial Roof Removal along with Contaminated Contents. 13 June 2024
- Asbestos Removal and Demolition 4 December 2023
- The Asbestos Group 17 Years Trading 18 July 2023
- Principal Contractor JCT Minor Works Building Contract 24 May 2023
- Major Loss Claim in Essex. 9 January 2023
- Wennington fire:Contaminated Building Deconstruction & Contents Removal. 8 September 2022
- Demolition Contractor Stored Dangerous Asbestos 7 April 2022